2008 Morpeth flood
St George's Church and Telford Bridge at 1332 BST on 6 September 2008. | |
Meteorological history | |
---|---|
Date | 6 September 2008 |
Overall effects | |
Fatalities | none |
Damage | approx. £40 million |
Areas affected | Morpeth, Northumberland, England |
The 2008 Morpeth flood occurred on Saturday 6 September 2008 in Morpeth, a town in Northumberland, northeastern England, when, following sustained heavy rainfall during the previous twenty-four hours, the River Wansbeck burst its banks and overwhelmed the town's flood defences. Nearly one thousand properties, mostly residential, were damaged.
Background
Previous flooding events occurred in 1863, 1876, 1877, 1878, 1881, 1886, 1898, 1900, 1903, 1924, 1963 and 1968 (Cotting Burn).
In 1992, a record peak water level of 3.19 metres (10.5 ft) was recorded in the river channel.[1] The 2008 flood level was 0.8 metres higher than this. However, there was not a flood event in 1992 as the defences successfully protected the town centre.
Meteorological history
The low pressure "Mattea" formed at the southern tip of Greenland on 3 September, deepening to approximately 980hpa as it passed to the south of Ireland on 5 September. The low then remained in place over the UK before dissipating on 9 September. An occluded front associated with this low moved slowly north across the UK producing flash flooding across the Midlands and the North.[2][3] The Environment Agency recorded 150 millimetres (5.9 in) of precipitation falling in the Wansbeck catchment area between Friday 5 and Saturday 6 September.[4] Figures suggest that in Morpeth alone there was 86 millimetres (3.4 in) of rain compared to an average of 74 millimetres (2.9 in) for a month.[1]
Physical causes
The River Wansbeck Valley is narrow and steep and as a consequence has exaggerated amounts of surface runoff. Based on three storm events, a reliable flow gauge located upstream of Morpeth at the confluence of the Wansbeck and Font showed that 99.9% of rain fall is converted into surface runoff.[5] Because the soil was already saturated as a result of the wet summer, the effect of surface runoff was greatly enhanced. Furthermore, increased urbanisation since the 1960s in Morpeth meant that most water falling on the town would have drained directly to the river channel. Other tests investigating the catchment lag time (time lapse between the midpoint of storm rainfall and peak river level) indicate that the Wansbeck has a lag time of only 8 hours.[5] This means that any water falling in the catchment area would have been rapidly converted into channel flow by surface runoff and to a lesser extent by throughflow. This is due to the steepness of the valley and the soil composition.
Effects and responses
Social
During 6 September 2008, more than 400 residents were evacuated.[6][7] Shelter was provided in the Town Hall, King Edward VI High School and County Hall. An error made by the Environment Agency's warning system meant that 198 properties in the Middle Greens area of the town did not receive a flood warning. Fire fighters, ambulance crews, the RAF, the RNLI and the British Red Cross were among the emergency services involved in rescue and recovery operations over the weekend, as well as some local nurses, GPs, a pharmacist and school staff who volunteered once the news of the flood broke out. They worked through the night attending to those affected. Many residents were forced from their homes, and lived in caravans or with relatives as rebuilding took place.
Economic
Nearly one thousand properties in Morpeth's town centre were directly affected by the flood water.[7] Among the businesses there, the ironmongers Smails and Sons, a cornerstone of the Morpeth community for over sixty years, was left completely out of stock. Early estimates suggested that damages could be over £40 million.[1] The actual figure was much greater, with total losses estimated at £40 million. On Sunday 7 September, Morpeth Lions Club and the Red Cross launched the Morpeth Flood Disaster Fund, which, by Wednesday 10 September, had raised over £20,000.[8]
Environmental
At the peak of the flood, Morpeth High Street (Bridge Street) was under 60 centimetres (2.0 ft) of water.[4] Not since 1963 had the main street been flooded. The library suffered severe structural damage due to the heavy debris transported by the river. Such was the extent of the damage that structural engineers were required to test its safety.
Aftermath
On Monday 8 September 2008, John Healey, the Floods Recovery Minister, visited Morpeth. Official government aid was pledged to the local authority to help with costs of the disaster through the Bellwin scheme. Mr Healey was also in talks with insurance industry chiefs, discussing their plans for dealing with a large number of claims in affected areas as quickly and effectively as possible.
Discussions with the Environment Agency to bring forward proposals for new flood defences took place. An Environment Agency report published in December 2007 had suggested that the town's flood walls needed improvement. Oldgate Bridge may need some structural changes made as it has a damming effect during flood events. An upstream reservoir to hold back flood water was also proposed. If successful, improvements could be made by 2011.
Morpeth Lions Club aimed to raise £100,000 for payment to those affected by the flooding without insurance.
The Prince of Wales (now Charles III) and the Duchess of Cornwall made an official visit on Friday 12 September, during which they inspected the damage and spoke with victims of the flood.
References
- ^ a b c Morpeth Herald "Worst on Record" Thursday 11 September 2008
- ^ "Klassische Wolkenstruktur von Tief 'Mattea'" (in German). donnerwetter.de. Retrieved 23 May 2012.
- ^ "England struck by flash flooding". BBC. Retrieved 23 May 2012.
- ^ a b BBC News "Flood clean-up operation begins" Monday 8 September 2008
- ^ a b Environment Agency, Wansbeck and Blyth Catchment Flood Management Plan
- ^ BBC News 'Morpeth a scene of devastation' Sunday 7 September 2008
- ^ a b Weaver, Matthew; Wainwright, Martin (8 September 2008). "Flood damage to cost 'tens of millions'". Retrieved 7 November 2018.
- ^ "Morpeth Flood Appeal tops £20,000", Morpeth Herald, Wednesday 10 September 2008.
External links
- The Morpeth Flood project (Geoff Parkin, Newcastle University, School of Civil Engineering and Geosciences)
- morpeth flood videos
- morpeth herald photos today flood photos[permanent dead link]
- v
- t
- e
- January 1881
- March 1891
- April 1981
- January 1995
- February 2009
- March 2013
- March 2018 (Emma)
- March 2023 (Larisa)
- Bristol Channel 16071
- Trent 1683
- Holmfirth 1738, 1777, 1944
- North East England 1771
- Strathspey 1829
- Thames 1928
- Thames 1947
- South England 1968
- Autumn 2000
- Summer 2007
- August 2008
- November–December 2009
- 2012–13
- Winter 2013–14
- Somerset Levels 2013–14
- Winter 2015–16
- June 2016
- Winter 2019–20
- Yorkshire Dales 2019
- Summer 2022
- 2023
- 2024
former hurricanes
- December 1703
- November 1824
- January 1839
- August 1848
- October 1859
- February 1871
- December 1879
- October 1881
- February 1903
- September 1961 (Debbie)
- February 1962
- January 1968
- January 1976
- August 1986 (Charley)
- October 1987
- January 1990
- October 1996 (Lili)
- December 1998
- January 2007
- September 2011 (Katia)
- December 2011
- January 2012
- October 2013
- December 2013
- Christmas 2013
- January 2014
- February 2014
- October 2014 (Gonzalo)
- November 2015 (Abigail)
- December 2015 (Desmond)
- December 2015 (Eva)
- October 2017 (Ophelia)
- January 2018 (Eleanor)
- October 2019 (Lorenzo)
- February 2020 (Ciara)
- February 2020 (Dennis)
- September 2020 (Alex)
- December 2021 (Barra)
- February 2022 (Eunice)
- October 2023 (Babet)
- November 2023 (Ciarán)