Hanlı–Bostankaya railway

40-kilometre long (25 mi) standard gauge railway line from Hanlı to Bostankaya

The Hanlı-Bostankaya Railway Line is a 40-kilometre long (25 mi) standard gauge (1,435 mm or 4 ft 8+12 in) railway line from Hanlı to Bostankaya. The line was built in 1995 and is only used by freight trains.

  • TCDD History: Electrification Trains of Turkey

  • v
  • t
  • e
District 1
Main
Branch
District 2
Main
Branch
  • Sincan–Kazan Soda
District 3
Main
Branch
  • Çatal–Tire
  • Ortaklar–Söke
  • Goncalı–Denizli
  • Menemen–Aliağa
  • Çobanisa–Kemalpaşa
District 4
Main
Branch
District 5
Main
  • Malatya–Çetinkaya
  • Fevzipașa–Kurtalan
  • Yolçatı–Tatvan
  • Van–Sufian
District 6
Main
Branch
District 7
Main
Branch
  • Gümüşgün–Burdur
  • Bozanönü–Isparta
  • Kütahya–Seyitömer
  • Tavşanlı–Tunçbilek
  • Sütlaç–Çivril
District 8
(High-speed rail)
High-speed
Higher-speed
Under construction
Railways in italics are not in service.
1 Partially disused.
Stub icon

This Asia rail-related article is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e